Scope of work
25,000 m² of construction floor area, including 3 basements and 2 above-ground floors.
Supply and installation of M&E systems, including:
- Heating, Ventilation, and Air Conditioning (HVAC).
- Water supply and drainage.
- Power distribution and lighting.
- Fire protection system.
- ELV systems.
- Building Management System (BMS).
- Wastewater treatment.
- Transformer station.
- Generator system.
- Vehicle access control, etc.